There are many different ways to apply render depending on the type of finish required, the type of lime used and the preference and experience of the person applying it. The following should give you an idea of some of the common procedures but is by no means the final word.
(PS. IF YOU JUST WANT A QUOTE FOR RENDERING YOUR PROPERTY, CALL US ON 0800 970 4928)
Rendering or plastering is not something that can be easily taught without a practical demonstration, but if you have already done some plastering or can get someone to show you how, there are several guidelines that will help you to use lime render successfully.
Lime renders shrink as the water in them evaporates. This can be minimised by using a well graded aggregate, by ensuring that the wall is well wetted before you start and by applying the render in thin coats of no more than half an inch. It also helps if the mix is as dry as possible but obviously it has to be wet enough to be workable and if you observe the other points you can get away with a slightly wetter mix which is easier to use.
If there are deep hollows in the surface of the wall dub them out first using lime mortar and small bits of stone or tile, and allow this to firm up before applying the first coat of render. There is no need to try to create an absolutely smooth flat surface as on most old buildings lime render and plaster looks best if it follows the contours of the wall.
Lime renders must be applied using as much pressure as possible to force the mortar into the surface crevices or between the laths to form a close contact between mortar and backing. For masonry walls, whilst it is possible to apply render using either a gauging trowel or a plasterers trowel the best result is achieved by throwing the mortar on from a trowel. This technique ensures the best bond between the mortar and the wall, expels any air in the mix and ensures that the mortar is well compacted.
If you use a float or gauging trowel it is very difficult to apply the render with equal pressure all over the wall: it will tend to be under more pressure over the high spots and under less pressure in hollows and therefore more likely to drop off.
Throwing render sounds difficult but it is surprisingly easy particularly for the scratch coat or dubbing-out coat, and involves less physical effort than using a trowel. This is particularly important if you are not used to plastering on a regular basis. It doesn’t matter if the first coat goes on rather unevenly as you can remove any excess mortar by running the edge of a trowel over the surface to cut off the rough bits. Just remember to protect windows, rainwater goods and any other areas that you do not want covered with lime mortar, including yourself, particularly your eyes.
If you prefer to trowel the mix on you may find it easier to apply the mortar using a gauging trowel rather than a plasterers trowel as it is better for getting into the hollows and maintaining an even pressure over the entire wall.
Once you have applied the scratch coat and got a fairly flat surface, subsequent coats can be applied successfully using a trowel, although it is still easier to throw it on.
Tyrolean rendering machines which splatter mortar onto the wall do not achieve the necessary level of compaction of the mortar as it hits the wall and are not suitable for the application of traditional lime renders.
For plastering onto wooden laths a plasterers trowel is suitable, but you must apply the plaster with enough pressure to force the mix between the laths so that it can flop over behind the laths and form the key.
Use a clean tarpaulin or sheet of polythene to protect the floor or ground along the foot of the wall. You will then be able to scoop up and re-use any mortar that doesn’t stick to the wall first time. If you simply cannot get the mortar to stick try re-wetting the wall or experiment with a slightly wetter mix.
As you apply the render do not try to smooth the surface by stroking with a steel trowel or float.
Working the surface of the wet mortar with a steel tool will draw the lime to the surface creating a lime-rich layer over a weak, lime-depleted layer which can lead to premature failure of the render. Simply apply with one stroke, pushing hard or throw it on. If there are high spots or ridges hold the edge of the trowel or float against the wall and draw it across the surface. This will cut off the rough bits and leave a good open texture.
As the mortar starts to firm up it may develop cracks, although cracking will be minimised if the points in the first paragraph are observed, and hydraulic lime tends to suffer less from shrinkage and cracking. Cracks in the base coats can be left as they will not compromise the strength of the plaster and will be covered by subsequent coats. However, you must make sure that the cracks are due to shrinkage and not because the coat is peeling away from the backing; push the coat gently to check that it is firm against the backing.
Create a key for the second coat by scoring the surface in a pattern of diamonds using a lath scratcher. Do not use the edge of a trowel as this will create too fine a groove to provide a good key. Some practitioners advocate throwing on the scratch coat and leaving it rough to provide the key for the next coat, but this depends on being able to throw the mortar on reasonably evenly in the first place or it will be almost impossible to render over it if there are huge humps and hollows. It is vital to take time and trouble over creating a good key as the adhesion of subsequent coats depends on it. Do not be tempted to miss areas in awkward places or at junctions with architraving or ceilings. Do not scour or float a scratch coat on laths. as this may damage the nibs.
There are two schools of thought regarding when to apply the second coat.
Some practitioners advocate applying the second and subsequent coats whilst the previous coat is still ‘green’ or ‘leather hard’, that is after it has firmed up sufficiently to resist indentation with a thumb but is still soft enough to scratch with a finger nail and is still damp.This varies according to drying conditions. For internal plaster it may be anything up to a week or so between coats. This method requires less dampening of the surface before application of the second coat and may achieve a better bond between coats. However, there is a risk that there might be further shrinkage in the base coat after the second coat has been applied, and it will take a lot longer for the undercoats to fully carbonate and achieve full strength.
The alternative approach is to allow the base coat to dry out slowly and start to carbonate. The work should be protected from drying out too quickly by covering with damp hessian for at least one week, and often for two to three weeks according to conditions. By this stage carbonation will have started (but not be very far advanced) and there should be no further shrinkage in the base coat. The base coat needs to be thoroughly dampened down before applying the next coat. This method is more dependent on a good mechanical key between the coats, and requires a longer period for completion of the work than the first method.
In the second coat cracks should be closed up by scouring the surface with a wood float using a circular movement and pushing hard to consolidate the coat. This will also enforce the bond between the coats and remove the high spots creating a flatter surface ready for the next coat. You may need to do this several times until the mortar is firm and no further cracks develop. The importance of this scouring and consolidation process for the success of lime rendering cannot be over emphasised. It must be done thoroughly no matter how wrist-breaking it may be.
Timing is also important. For non-hydraulic lime the mortar must be firm enough that the scouring will not just re-work the mortar, but not so firm that the cracks cannot be closed up. This can be anything from several hours to several days depending on conditions.
Always ensure that the previous coat is damp before applying the next one. If applying a fairly fine top coat, keying of the previous coat is best carried out using a comb scratcher or a devil float which creates a finer key than a lath scratcher. If the keying is too coarse it may well result in cracking of the top coat along the lines of the key because the render will be comparatively much thicker in these places.
The final appearance depends on the type of mortar used for the top coat and the tools used to finish it. Scouring with a wood float will result in a fairly open texture suitable for the majority of external renders on vernacular buildings. For internal plastering a combination of wood and sponge floats and a plasterers trowel can be used to create a smooth polished finish. A traditional type of external render finish for simple cottages and farmhouses is known as roughcast. A slurry of mortar containing some quite coarse particles of gravel is thrown onto the top coat of render from a dashing trowel. This creates a rough texture with a large surface area which helps in allowing the wall to breathe, but requires some expertise to avoid a porridgey mess.
The work must be protected to prevent rapid drying. Both hydraulic and non-hydraulic limes must be kept slightly damp but at the same time air must be allowed to circulate. If using polythene or tarpaulin it should be fixed so that there is a gap between it and the wall. Remember that water will drain down through the render under gravity so the upper parts of a wall will start to dry out faster than the lower parts and you may need to spray these areas more frequently. Frost can be a particular hazard to a young render as it can cause damage weeks after the render was applied, especially if preceded by heavy rainfall. It is a fallacy to believe that by using hydraulic lime or a pozzolanic additive you can “beat the frost”.
It is only the initial setting which takes place by hydraulic reaction and the mortar still requires a long period of time to carbonate and strengthen. If hard frost is forecast within a couple of months of application then ideally the render should be protected by hanging polythene, bubble wrap or hessian over it, although on most buildings this may be impossible. A render which survives its first winter unscathed is more likely to wear well subsequently.